Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13634604

- Product Categories
- Friendly Links
Information Name: | Plastic runway project | Camry Sport (Advisory) | Inner Mongolia plastic runway |
Published: | 2015-06-16 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Dealing with emergency situations (1) If the plastic venues pavement rain during sudden rain emergency, the immediate cessation of the ingredients, with pre-prepared plastic film cover motor, stirrer and barrels and other materials, such as blender The mixed mortar should have been immediately poured mortar skip, when the garbage out. Windy Emergency (2) wind occur if the pavement construction process, immediately stop ingredients, paving process, if there is debris blew on dope or level, should continue to be cleared of debris. (3) If the ingredients found during power outages blackouts, such as the timely repair of the circuit should be repaired immediately, plastic track laying, if not promptly repaired immediately stop ingredients notify the paving process downtime prepared to do if the blender There should waste material away. Construction requirements for plastic runway plastic runway construction in asphalt or concrete foundation, basic practices and road construction about the same. Higher base surface flatness requirements to ensure consistency plastic surface layer thickness, Inner Mongolia plastic runway, elastic uniform, on the basis of quality requirements are as follows: 1 slope: horizontal <1% (curve 8 ‰, straight 5 ‰, semicircular area 5 ‰), plastic runway stadium construction, longitudinal <1 ‰, high jump area <0.4%, the surface should be flat, smooth, smooth drainage. 2. Flatness: Flatness pass rate above 95%, high-quality composite plastic runway, 3 m straightedge error 3mm. 3, positioning: the exact construction and draw lines, need for strong distinctive markers mark the four semi-tangent points and two runway center site. 4. Drainage: drainage system is necessary in two hours after the rain water discharge. In the frozen area, between the asphalt layer and add a layer of gravel layer is preferably a cloth buffer layer. Drainage trench along the foundation should do special water treatment. 5, the strength and stability: the foundation should have a certain strength and stability, even a solid surface, no cracks, no bad side seams straight and smooth. Cushion compaction, density of greater than 95%, after the medium-sized rolling machine pressure, no significant wheel tracks, loose topsoil, waves and other phenomena. Plastic runway project | Camry Sport (Advisory) | Inner Mongolia plastic runway Ltd. provided by the Dongguan City Camry sports facilities. Dongguan City Camry Sports Facilities Engineering Co., Ltd. (www.kmtyss.com) Dongguan, Guangdong, related products leader, over the years, the company implement the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In the Camry sports leadership with the staff warmly welcome all inquiries negotiations to create the Camry sports a better future. |
Admin>>>
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility