Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13634604

- Product Categories
- Friendly Links
Information Name: | Plastic runway construction | Camry Sport (Advisory) | plastic runway |
Published: | 2015-06-10 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Inspection process (1), with a tie cone and feeler primer thickness. (2), with a 3 m straightedge or large scale test primer bar flatness quality composite plastic runway, the higher part must be required for grinding. (3), the surface layer laying a. Construction step (a), the required test primer, primer treatment. (B), to configure a small amount of plastic, paving test badminton courts plastic runway, construction program to determine the handling and testing of the foundation. (C), to measure temperature, humidity and other parameters and make a record. (D), drawn construction line construction plans ready for each day. (E), the deployment of plastic: Upon request by Group A Group B after sub-sub-mixing evenly, adding a catalyst to continue stir. (5), underlined the overall standard 1. The standard runway length of 400 m campus plastic track, by two parallel straights and two equal radius corners components. Weeding to the runway, along the inner side of the runway sudden application of a suitable material to be boundaries. Ledge about 5 cm wide and at least 5 cm. 2. Should projecting beyond the outer edge of 30 cm measured along the length of the runway at the runway. If no curbs should be measured at 20 cm beyond the outer edge of the marker line. Note: "IAAF Track and Field Facilities Manual" contains all the relevant track structure, design, technical information flag. This rule gives the basic principles that should be followed. 3.400 m and 400 m of the following track, each athlete should occupy a lane, lane width of a minimum of 1.22 meters plastic runway, up to 1.25 m, lane width of 5 cm, all lanes should be the same width. The provisions of paragraph 2 shall measure the length of said first lane and the other lane length shall be measured at 20 cm beyond the outer edge of the inside lane line. NOTE: lane width should include the right of the lane line plastic runway construction | Camry Sport (Advisory) | plastic runway provided by the Dongguan City Camry sports facilities Engineering Limited. Dongguan City Camry Sports Facilities Engineering Co., Ltd. (www.kmtyss.com) Dongguan, Guangdong, related products leader, over the years, the company implement the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In the Camry sports leadership with the staff warmly welcome all inquiries negotiations to create the Camry sports a better future. |
Admin>>>
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility