Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13634604

- Product Categories
- Friendly Links
Information Name: | Long-term production of plastic stadium runway | plastic runway | Camry sports |
Published: | 2015-06-04 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Construction Step 1, garbage within the site, the basis for the manner described above to detect and make a record, clean water, dry with a hair dryer to blow the dust within the site; the ingredients, mixing good quality site cleaning compound plastic track, keeping the site clean and gum ingredients around. Plastic track construction plastic runway construction 2, with a wire brush to mud within the site, lime point brushing; 3, with a hammer, can not afford to brush Qianzai lime, cement and convex portions disposed of, then sweep the entire site ; 4, take a small amount of glue, proportionately configured, a small test field. After the experiment, the experimental results the next process. 5, base back, the water part of the leveling material, the density of the place with a rubber seal failure. 6, the pavers need to be adjusted according to the scale, and then spreading construction throughout the thickness should meet the design requirements; 7, to be grassroots Puwan sclerosis, turn on the water looking for water points, the water treatment process at the above leveling to primer without water. After the primer is completely hardened, with a grinding machine on its surface polished to meet the requirements of flat, non-slip surface and then spit. 8, according to the drawings and design requirements sport stadium mixed plastic track, marked various lines located within the site; primary surface treatment a, moisture exclusion concrete moisture content should be less than 5%, or should be carried out only after removing the water painting. The method for removing the water are the following: Ventilation: enhance air circulation and accelerate the air flow, remove moisture and promote further evaporation of water in concrete. Heating: improving cement concrete and the surrounding air temperature, speed up concrete migrate to the surface of the water rate, it quickly evaporates. It should use forced air heating and radiant heating. b, PH value is greater than the plastic track surface back to base 8, with the pickling process: pickling (for more oil in the ground): the mass fraction of 10 to 15% hydrochloric acid to clean concrete surface of the reaction After completion of the granular breathable plastic runway, then rinse and scrub with a brush, this method can clear the mud layer and get finer roughness. c, the flatness is poor or too smooth ground surface area without the use of large mechanical methods: blasting or electric grinder to remove surface projections, loose particles, damage pores, increased adhesion area, with a vacuum cleaner sucked sand, impurities, dirt. For more depressions, potholes ground, use plastic and fine particles arranged glue or putty filled patch. Long-term production of plastic stadium runway | plastic runway | Camry Sports Ltd. provided by the Dongguan City Camry sports facilities. Dongguan City Camry Sports Facilities Engineering Co., Ltd. (www.kmtyss.com) strong, credible, in Dongguan, Guangdong related products industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Camry into the brilliant sports and you work for a better future! |
Admin>>>
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility