Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13634604

- Product Categories
- Friendly Links
Information Name: | Sports plastic track, Camry sports (online consultation), Sichuan plastic track |
Published: | 2015-06-03 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Construction Step 1, garbage within the site, the basis for the manner described above to detect and make a record, clean water plastic runway construction, dry with a hair dryer to blow the dust within the site; the ingredients, stirring well to clean up the site, gum ingredients to keep clean around the site. Plastic track construction plastic runway construction 2, with a wire brush to mud within the site, lime point brushing; 3, with a hammer, can not afford to brush Qianzai lime, cement and convex portions disposed of, then sweep the entire site ; 4, take a small amount of glue, proportionately configured, a small test field. After long-term production of plastic runway experiment stadium, the next process based on experimental results. 5, base back, the water part of the leveling material plastic runway, the compactness of the place with a rubber seal failure. 6, the pavers need to be adjusted according to the scale, and then spreading construction throughout the thickness should meet the design requirements; 7, to be grassroots Puwan sclerosis, turn on the water looking for water points mixed plastic sports stadium runway, the water Process for leveling of the above, to the end of glue without water. After the primer is completely hardened, with a grinding machine on its surface polished to meet the requirements of flat, non-slip surface and then spit. 8, according to the drawings and design requirements, various lines marked in the venue site; the construction process polyurethane plastic material fear of water, before the initial curing mortar hit a drop of water will produce a large bubbles, so the construction personnel working at high temperatures to prepare towel wipe. Sure know about the weather conditions and the adhesive side of the shop to do emergency measures to prevent the dump showers. Shop glue time to avoid the morning air and ground humidity of the time, even in a normal working day in fine weather, is usually best after nine o'clock in the formal laying plastic track laying. Sports plastic track, Camry sports (online consultation), Sichuan plastic runway provided by the Dongguan City Camry sports facilities Engineering Limited. Dongguan City Camry Sports Facilities Engineering Co., Ltd. (www.kmtyss.com) Dongguan, Guangdong, related products leader, over the years, the company implement the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In the Camry sports leadership with the staff warmly welcome all inquiries negotiations to create the Camry sports a better future. |
Admin>>>
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility