Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13634604

- Product Categories
- Friendly Links
Information Name: | Sports stadium mixed plastic runway, the plastic runway, Camry sports |
Published: | 2015-06-02 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Prefabricated plastic track is a prefabricated web runway. Natural rubber and rubber-based artificial mixed mineral fillers, stabilizers and colorants continuous rolling process in the factory, and a high temperature of 280-300 ℃ sulfur cured integrally molded, mechanical embossing, texture consistent double Structure of synthetic rubber. (Common types of professional track and field stadium, but the price is high particulate breathable plastic runway, a general primary and secondary schools can not afford) construction process 1, garbage within the site, the basis for the manner described above to detect and do good record, cleaning water, dry with a hair dryer to blow the dust within the site; the ingredients, mixing well site clean and keep clean around the gum ingredients venue. Plastic track construction plastic runway construction 2, with a wire brush to mud within the site, lime point brushing; 3, with a hammer, can not afford to brush Qianzai lime, cement and convex portions disposed of, then sweep the entire site ; 4, take a small amount of glue, proportionately configured high-quality composite plastic runway, a small test field. After the experiment, the experimental results the next process. 5, base back, the water part of the leveling material, the density of the place with a rubber seal failure. 6, the pavers need to be adjusted according to the scale, and then spreading construction throughout the thickness should meet the design requirements; 7, to be grass-roots sports stadium Puwan hardening mixed plastic track, turn on the water looking for water points, the water Process for leveling of the above, to the end of glue without water. After the primer is completely hardened, with a grinding machine on its surface polished to meet the requirements of flat, non-slip surface and then spit. 8, according to the drawings and design requirements, various lines marked in the venue location; sports stadium mixed plastic runway, the plastic runway, Camry sports provided by the Dongguan City Camry sports facilities Engineering Limited. Dongguan City Camry Sports Facilities Engineering Co., Ltd. (www.kmtyss.com) strong, credible, in Dongguan, Guangdong related products industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Camry into the brilliant sports and you work for a better future! |
Admin>>>
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility