Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13634604

- Product Categories
- Friendly Links
Information Name: | Artificial turf stadium _ Camry sports (certified) _ artificial grass |
Published: | 2015-05-13 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Material structure of artificial turf: artificial turf material consists of three layers. Base layer is made of compacted soil, gravel layer and asphalt or concrete layer. It requires a solid base layer, no distortion, smooth surface and impermeable, namely general concrete venue. Due to the large hockey the area, must handle the construction of the base layer to prevent subsidence. If laying concrete layer, after the concrete has cured to cut expansion joints to prevent thermal expansion deformation and cracks. Above the base layer is a buffer layer, usually composed of rubber or foam. Rubber elastic medium, the thickness of 3 ~ 5mm. Foam with a lower cost, but poor elasticity, thickness 5 ~ 10mm, thick lawn is too soft, and easy to depression; lack of elasticity is too thin artificial turf football field, would not achieve the buffer. The buffer layer should be firmly adhered to the base layer of artificial turf football field, with white latex or general-purpose adhesive paste. The third layer is the surface layer, the divot. Manufactured in accordance with the surface shape of downy turf, annular curled nylon turf, leafy turf polypropylene fibers, nylon yarn preparation of permeable turf like. This layer must also be used in the rubber or the milk foam adhesive. Must be comprehensive coating, followed by pressure against the construction of the prison, not from wrinkles. In other countries, common two divot: 1, divot leafy fiber is thin, only 1.2 ~ 1.5mm; 2, thicker turf fiber, 20 ~ 24mm, which is filled almost to the top with a quartz fiber. Artificial turf laying Notes 1, 20 or 30 cm wide connection with artificial turf turf spread along the seams into the sod, turf seams located as far as possible to connect with a central (if rain wet, need drying for a long time and dried), and all-purpose adhesive water with a rubber scraper evenly scraping connection tape, then put together on both sides of the turf, artificial turf adhesive tape to connect the runway, and beat with a rubber hammer, so as to enable the binding moiety close bonding. If straightening split at the large gap can be separated in a 2-5 cm cut here, stretching to the interface in order to ensure artificial turf appearance; 2, after the artificial grass turf basic stitching is completed, once again the cable set the various functional lines, the exact location of the point of order knife cut, strip cut out of the grass, the connection with the put, knife glue, put the original back in the prepared white grass line, after cementation, rubber Hammer repeatedly beat, to ensure tight bond connecting portion. 3, when the artificial grass turf paving mosaic is completed, the turf Folding knife needs to be part of the opening, straightened butt, cut overlapping part, then cemented; 4, after all turf bonding is completed, starting with Brush Rake sort: first pass brush grass machine lodging audience stand up grass line comb. 5, Pavement turf artificial turf so far completed. Artificial turf stadium _ Camry sports (certified) _ artificial turf provided by the Dongguan City Camry sports facilities Engineering Limited. Dongguan City Camry Sports Facilities Engineering Co., Ltd. (www.kmtyss.com) Dongguan, Guangdong, related products leader, over the years, the company implement the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In the Camry sports leadership with the staff warmly welcome all inquiries negotiations to create the Camry sports a better future. |
Admin>>>
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility