Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13634604

- Product Categories
- Friendly Links
Information Name: | Basketball courts plastic runway | Camry sports (certified) | Foshan Stadium |
Published: | 2015-04-13 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | With the increase of silicon PU basketball court pu stadium, many silicon PU stadium are a problem in the face of these problems as a professional construction company Silicon PU basketball court how silicon PU basketball court repair and maintain it? 1, silicon PU basketball court venue clean, repair and maintenance is an ongoing task. In addition to daily cleaning, also should wash once a quarter pu big basketball games, including severe pollution to increase the amount of detergent to wash or wipe. 2, before and after the race to clean and maintain the site colors and clean. Hot summer weather, cold water spray court to reduce its surface temperature. A variety of lines and symbols Silicon PU basketball court should remain clearly visible. Over time, the aging of the plastic surface, various flags will fade. So, a few years later to re-paint the sign. 3, such as fragmentation occurs, peeling and other phenomena, specifications should be repaired to prevent the spread. Should regularly clean and maintain drainage flow. 4, the next rain water for the stadium to be cleared up. 5, in the course, forbidden to wear shoes, walk on nails. Hybrid construction process of a plastic track, or back to the foundation waterproofing treatment, paving the runway can be maintained 24 hours after the bottom two, the product ratio: A component: Group B inseparable 1: 5 (weight ratio), The catalyst was 1% PU reference but the total, according to the national standard runway substrate doped 25% diameter 3-4mm high elastic black rubber, stir the site, scraping rake Calibrating, laying thickness of 9mm, curing and maintenance 24 hours. 3, and then take care of the special anti-skid particles according to ratio of 1: 1 mixing evenly, with a uniform spray sprayer 4, 24 hours after the maintenance of the venues can draw lines, can be used to track maintenance for a week in a normal operating temperature range finish without the use of catalysts. Basketball courts plastic runway | Camry sports (certified) | Foshan, Dongguan City, Kay course offered by the United States Sports Facilities Engineering Limited. Dongguan City Camry Sports Facilities Engineering Co., Ltd. (www.kmtyss.com) is Dongguan, related products leader, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In the Camry sports leadership with the staff warmly welcome all inquiries negotiations to create Camry sports a better future. |
Admin>>>
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility