Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13634604

- Product Categories
- Friendly Links
Information Name: | Silicon pu stadium floor | Shanwei Stadium | Camry sports |
Published: | 2015-04-10 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | I produced breathable runway general use professional paver, flatness has been effectively controlled, plus upper layer using a professional sprayer with spray polyurethane glue also high, so the surface layer and other types of runway Compared fastness is relatively large, the basic need for maintenance during use, greatly reducing maintenance costs. Elastic layer breathable runway recycled scrap tires and other rubber material crushed into particles paving, reducing the "black pollution", and make a contribution to environmental protection. Basic requirements: breathable plastic runway to the use of cement concrete foundation, foundation requirements should have a certain strength and stability. Or may not have cracks and freezing due to uneven heaving caused by the high water content of the formation still need to add cushion needed basis thickened or measures taken to prevent frost in cold regions according to local geological conditions. The thickness of cement concrete generally require 120-150mm about 3 m straightedge flatness error does not require more than 3 mm pitch, intensity required to achieve more than C20, the slope surface to the outer edge of the inner self plastic runway edge (gutter) put 6 ‰ -10 ‰ slope, it is recommended to do 8 ‰ appropriate. Cement concrete at intervals of not more than 6 meters should be cut sew, sew recommend 4-5 Mitch tennis silicon pu cost, cement concrete curing period as proposed by the standard curing period of 28 days. In the case of poor flatness is prohibited to do with pure cement mortar leveling layer of skin type, should be left to deal with when the surface construction. Construction Technology: Brush evenly with a brush to single-component glue or cement foundation primer. Before primer uncured, the single-component glue and black rubber granules according to a predetermined ratio ratio, stir with a mixer, transported to the paving site artificial turf soccer field, as required by the paver paving thickness; cured silicon pu stadium floor, it becomes elastic layer. Breathable surface with spray glue and EPDM rubber, EPDM powder ratio according to a predetermined ratio, stir, pour a dedicated sprayer, clockwise and counterclockwise points twice to three times spraying, curing and for slip resistant layer of color is now widely used for the red and green. Hybrid construction process of a plastic track, or back to the foundation waterproofing treatment, paving the runway can be maintained 24 hours after the bottom two, the product ratio: A component: Group B inseparable 1: 5 (weight ratio), The catalyst was 1% PU reference but the total, according to the national standard runway substrate doped 25% diameter 3-4mm high elastic black rubber, stir the site, scraping rake Calibrating, laying thickness of 9mm, curing and maintenance 24 hours. 3, and then take care of the special anti-skid particles according to ratio of 1: 1 mixing evenly, with a uniform spray sprayer 4, 24 hours after the maintenance of the venues can draw lines, can be used to track maintenance for a week in a normal operating temperature range finish without the use of catalysts. Silicon pu stadium floor | Shanwei Stadium | Camry Sports Ltd. provided by the Dongguan City Camry sports facilities. Dongguan City Camry Sports Facilities Engineering Co., Ltd. (www.kmtyss.com) strong, credible, in Dongguan, Guangdong and other related products industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead the Camry into the brilliant sports and you work for a better future! |
Admin>>>
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility