Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13634604

- Product Categories
- Friendly Links
Information Name: | Composite plastic runway, Guangdong runway, Camry sports |
Published: | 2015-01-31 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Breathable plastic runway construction program First, the scope: Suitable for all types of schools teaching the general venue. Second, the main material: Polyurethane glue, EPDM color particles (diameter of 1 to 2 mm), black rubber particles (diameter of 2 to 4 mm), EPDM powder, spray mixture three faces, machinery equipment: plastic mixer, plastic sprayer plastic pavers, trowels, professional cutter, Level, Total Station, the level of foot, scales, trolleys, stirring barrels. Fourth, the performance characteristics: breathable plastic track surface layer thickness of 13 mm, and has good air permeability seepage, elasticity, surface construction using high-pressure spray particles can not afford. Breathable plastic runway more economical. Five life: 3 to 5 years. Sixth, the construction program: Surveying → black rubber granules laying laying rubber elastic bottom line → → drawing surface. Seven construction points: 1, using theodolite or total station positioning actinomycetes, according to the proportion of the first material of polyurethane glue and black particles into the mixing bucket Stir basketball runway, poured into plastic paver paving. 2, in the playground down the runway before paving, paving should be in the region of the glue backing roll, which uses edge glue backing roll edge paving way for construction. 3, the second day after the completion of construction to the bottom of all construction surface spray. According to the proportion of the first material of polyurethane glue Stir into the mixing bucket, and finally into the requirements of the proportion of EPDM color granules, EPDM face powder and spray mixture, then stir, then sprayed into the machine track, evenly coating the bottom upper layer, spray stool; after all the construction is completed the surface layer can be carried out the next day to draw lines. Eight, drawing a line requirements: The ruler had identified, total station according to the International Association of Athletics Federations (IAAF) standards and norms and track and field sports craft marking requirements actinomycetes, drawing a line. Nine, acceptance requirements: Refer to the International Association of Athletics Federations (IAAF) standard and GB GB / T14833-1993 acceptance. Camry sports - undertake a variety of mixed plastic track stadium construction project: 1. plastic track surface construction process: determining the scope of construction → → Clean the underside of the basic foundation and leveled primer → → brushing waterproof plastic timber buffer layer detection → → → surfaces scratch repair, spray and sprinkle colored EPDM granules → crossed → acceptance. 2. Mix plastic runway construction process: (1) entering first determine the scope of construction, well marked. (2) the basis for the first floor cleaning composite plastic runway, for a period of time after the completion of the site thoroughly clean and dry. (3) For the uneven ground (water districts) fill level. (4) the need to cement the basis for water treatment, the use of roller layer of waterproof material, waterproof material per square reference amount 0.15-0.2kg. (5) maintenance cured 24 hours, you can track the underlying paving After curing waterproof material, the use of two-component glue, PU material with a particle diameter of 3-4mm high elastic black rubber stir evenly mixed, then the whole uniform paving plastic buffer layer. (6) Construction paving plastic buffer layer after layer of detection of these data to ensure the overall quality of the project. (7) to detect problem areas repair process can be carried out only after the deal with the construction of the next process. (8) curing the maintenance needs of more than 48 hours (under normal weather conditions), can then be carried out in accordance with the construction site were crossed runway standard specifications. (9) Clean, finishing the construction site after the evacuation. (10) after the completion of all field maintenance 15 days can be put into use. Camry Sports - Sports Facilities stop service experts composite plastic runway, Guangdong runway, Camry sports provided by the Dongguan City Camry sports facilities Engineering Limited. Dongguan City Camry Sports Facilities Engineering Co., Ltd. (www.kmtyss.com) strong, credible, in Dongguan, Guangdong and other related products industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead the Camry into the brilliant sports and you work for a better future! |
Admin>>>
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility