Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13634604

- Product Categories
- Friendly Links
Information Name: | Silicon pu indoor stadium construction | Henan silicon pu | Camry sports |
Published: | 2015-01-19 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Should be carefully checked before the elastic layer of silicon pu stadium construction can only confirm that the foundation has been dealt with elastic layer construction, the elastic layer (TB-002) for curing one-component water-absorbing material such as silicon pu basketball court built with tooth scraper scraping directly to the base surface, each scraping thickness can not exceed 2.5mm, before each time interval Road Scraping together to dry subject (usually about 10 hours laying silicon pu material, depending on weather conditions site) until scraping to the desired thickness. Low temperatures, when the paint consistency increases, can be added to an appropriate amount of diluent (xylene, ethyl acetate, 200 # solvent oil) to adjust the consistency of construction, if the temperature is below 15 ℃ and the relative humidity is low (<60%) must be added After 3 to 5% water and stir evenly coated scratch to accelerate curing silicone pu material prices, reducing the interval, the specific amount of water depending on the weather scene. Must do a small test before using thinner (by TB-002: thinner = 10: 3 Stir do 1.5 ~ 2mm thick sample blocks), and confirmed no problem curing diluted before use. Construction should avoid the sun at high temperatures should be kept 2 to 3 hours from strong sunlight silicon pu after construction, or due to surface too quickly can cause the surface bubbling molding. After the elastic layer to dry, with water method to test the surface roughness, the water at the patch with TB-002 flat surface or if particulate debris piled at the mill or other tools required to be reinforced layer construction after finishing level. Must be weighed accurately and stir when silicon pu Stadium Cautions ● deployment of materials. ● Construction of the entire process for each procedure must keep the surface clean before construction. ● indoor venues must ensure good ventilation. ● After the laying of the need to maintain the site for more than five days to put into use. ● Never wear shoes, high heels or shoes easy to play off the color. ● Do not cut extrusion, surface friction should not be with hard objects, so as not to damage or rupture. ● Do not use acid, alkali and other corrosive chemicals on the floor and away from fire, heat, to avoid deformation of the floor. Silicon pu indoor stadium construction | Henan silicon pu | Camry sports provided by the Dongguan City Camry sports facilities Engineering Limited. Dongguan City Camry Sports Facilities Engineering Co., Ltd. (www.kmtyss.com) strong, credible, in Dongguan, Guangdong and other related products industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead the Camry into the brilliant sports and you work for a better future! |
Admin>>>
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility