Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13634604

- Product Categories
- Friendly Links
Information Name: | Runway Runway material materials manufacturers _ _ Camry sports |
Published: | 2015-01-12 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Hard Acrylic construction process: 1, test the water: for the stadium to test the water, the test site flatness, one hour after watering, stagnant water in the depression than 3mm at the asphalt ground with chalk marking, do not use pencil crayons or oil, in order to avoid contamination 2, the fill level: professional materials make up the ground to reach Ping Road until flatness requirements tennis court, so that any two points per square meter elevation lower than 3mm. 3, undercoat: professional audience Scraping primer material so that the ground floor is more uniform, dense runway material prices, combined with enhanced ground and coatings. 4. Strengthen layer: Scraping the audience with acrylic filler watered-doped layer to 60-80 mesh silica sand. After stir Scratch scratch with imported rubber rake. Above ground level and then provide a uniform runway material, thick cushion, increasing the strength of the stadium. Dry about 24 hours. 5, the texture layer: Acrylic governor water feeding the audience scratching acrylic floor governor after the incorporation of acrylic pigment material is a mixture of quartz sand 100% acrylic emulsion. So strong and durable textured surface to improve the function of adjusting the speed of the ball and wear-resistant. Each layer dry and conservation needs 24 hours. 6, finishing layer: Scraping the audience with acrylic pigment layer of acrylic pigment watered, not sand, stir after scraping. So colorful and pleasing to the eye surface, with a weather-resistant and anti-UV properties, more beautiful and durable. About 24 hours to dry and maintenance. Texture layer plus a total of three pigment finishing layer 7, crossed: a measure in accordance with international standards alignment rubber track material with acrylic painting white lines stadium boundaries, with imported paste tape machine tape tightly adhered to by line ground to prevent flash, direct brush with a brush paint a layer of acrylic paint white lines. EPDM construction of a stadium. Check whether the foundation construction: foundation flatness, drainage slope, density (cement base grade of not less than C20, asphalt surface density of the solid foundation of the more than 90%), be sure to keep the site before construction dry, can not have water. 2. Survey Site area: Learn quantities (construction area), engineering content (what types of products), to calculate the amount of materials needed for each side of the cottage, and then live material inventory, calculate the total amount of material is enough to complete the project amount to at the construction process with the use of proper materials runway construction materials, does not cause enough or have more material remaining at the end of the project. 3, the end of plastic laying: a) in accordance with the process required to measure the position of the construction line, put away the construction line. b) start laying side by site, according to the width of the one-time site scraping gum. c) even when the squeegee speed, timely show the bottom of the depression, were raised at the glue or gelling. d) After gelling of the audience checks to ensure that the thickness of the laying surface plastic. 4, rubber paving: minimize the time a) intervals for each barrel scraping gum glue, making uniform gelation speed. b) the thickness of the plastic surface observation time. c) ensure that particles do not fall off. 5, according to the current planning process line spray athletic venues and facilities standards to accurately measure the position of the processing line, and then airbrushed the runway with polyurethane paint materials manufacturers _ _ Camry sports runway material provided by the Dongguan City Camry sports facilities Engineering Limited. Dongguan City Camry Sports Facilities Engineering Co., Ltd. (www.kmtyss.com) strong, credible, in Dongguan, Guangdong and other related products industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead the Camry into the brilliant sports and you work for a better future! |
Admin>>>
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22225 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City Camry Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility